Utility-Scale Solar – Power the Future

Large-scale solar installations (1 MW to 100+ MW) delivering cost-effective, renewable electricity. From concept to operation, we handle complete project development with proven expertise and exceptional returns.

Why Utility-Scale Solar?

Utility-scale solar plants have become the most cost-effective source of electricity globally. With India’s renewable energy targets and competitive bidding processes, large-scale solar offers institutional investors, corporations, and government entities reliable long-term returns combined with environmental impact.

Competitive Returns

12-18% IRR typical. Better returns than many infrastructure investments. Predictable cash flows.

Grid Stability

Large-scale plants support grid stability. Valuable for energy security and grid resilience.

Scalability

From 1 MW to 100+ MW. Modular, scalable approach. Expand capacity as market evolves.

Policy Support

Government target: 500 GW renewable by 2030. Priority sector status, tax benefits, fast-track approvals.

Environmental Impact

Offset 1,000+ tons CO2/MW annually. Major contribution to climate goals and corporate ESG.

Long-Term Stability

25-year PPA (Power Purchase Agreements) provide revenue certainty. Bankable, institutional-grade assets.

Types of MW-Scale Solar Projects

Utility-Scale Solar Installation Models

Utility Grid-Connected Power Plant

  • Ownership: Developer/power company electricity to grid
  • Capacity: 5-100 MW typical (MW-scale starting point) 
  • Buyer: State/National grid operator, discos 
  • Revenue: PPA tariff (₹2-3.50 per unit typical) 
  • Tenure: 25-year power purchase agreement 
  • Location: Utility designated solar parks or land 
  • Development Period: 12-18 months (concept to operation) 
  • IRR: 12-15% typical 
  •  

Corporate Renewable Power Agreement (CRPA)

  • Ownership: Developer/company corporate buyer 
  • Capacity: 5-50 MW typical (corporate consumption) 
  • Buyer: Large corporation, manufacturing unit, IT park 
  • Revenue: Fixed tariff (often ₹2.50-3.50/unit, fixed 25 years) 
  • Benefit to Buyer: Cost certainty, sustainability commitment 
  • Location: Corporate facility or identified location 
  • Development: 10-15 months 
  • IRR: 13-17% typical 
  •  

Government Solar Park Leasing 

  • Ownership: Government/developer consortium
  • Capacity: 10-100 MW in designated solar parks 
  • Operator: Government authority 
  • Revenue: Lease income per MW + power tariff 
  • Benefit: Risk shared, government backing 
  • Location: Identified solar park zones 
  • Development: 12-16 months 
  • IRR: 11-14% typical
  • Investment: ₹10-500 crores

Renewable Energy Auction (Competitive Bidding) 

  • Ownership: Private developer (winning bidder) 
  • Capacity: 10-500 MW (competitive tenders) 
  • Buyer: NTPC, state Discos, others 
  • Revenue: Auction-won tariff (₹2.00-3.00/unit competitive) Benefit: Large scale, government-backed buyer 
  • Qualification: Pre-qualified developer status needed Development: 15-18 months 
  • IRR: 10-14% typical (competitive pricing)
  • Investment: ₹50-1,000+ crores

Hybrid Solar + Wind + Battery (Advanced) 

  • Combines multiple renewable sources 
  • Capacity: 10-100 MW solar component 
  • Advantage: Smoothens generation profile, attracts premium
  • Revenue: Higher tariff (₹3-4 per unit possible) 
  • Technology: Complex, requires expertise 
  • Development: 18-24 months 
  • IRR: 14-18% (highest returns)
  • Investment: ₹15-500 crores

Understanding MW-Scale Economics

Large-Scale Solar Project Financials

Land Acquisition & Development
– Land (250 acres @ ₹15 lakhs/acre): ₹3,75,00,000 
– Site development & leveling: ₹40,00,000 
Subtotal: ₹4,15,00,000 

Solar Power Generation Equipment: 
– Solar panels (62,500 kW @ ₹25/watt): ₹15,62,50,000 
– Inverters & transformers: ₹2,00,00,000 
– Mounting structures & balance: ₹2,50,00,000 
Subtotal: ₹20,12,50,000 

Infrastructure & Grid Connection: 
– Substations & switchgear: ₹1,50,00,000 
– Control systems (SCADA): ₹60,00,000 
– Evacuation line to grid: ₹2,00,00,000 
– Roads, fencing, security: ₹1,00,00,000 
Subtotal: ₹5,10,00,000

Project Management & Miscellaneous: 
– Engineering & project management: ₹1,50,00,000 
– Permits & clearances: ₹50,00,000 
– Contingency (5%): ₹1,53,75,000 
Subtotal: ₹3,53,75,000

TOTAL PROJECT CAPEX: ₹33,91,25,000 (~₹33.9 crores) Cost Per MW: ₹33,91,25,000 ÷ 25 MW = ₹1.356 crore per MW 

Revenue & Cash Flows (25-Year Projection): 

OPERATIONAL PARAMETERS: 
Capacity: 25 MW 
Capacity Factor: 22% (India average, varies by location) Annual Generation: 25,000 kW × 22% × 8,760 hours = 48,180,000 units 

REVENUE CALCULATION: 
PPA Tariff: ₹2.80 per unit (typical for 25 MW plant) 
Annual Revenue: 48,180,000 × ₹2.80 = ₹13,49,04,000 

Annual Operating Expenses: 
– O&M Cost (1% of CapEx): ₹33,91,25,000 × 1% = ₹33,91,25,000 Actually ₹33.9 lakhs annually for maintenance 
– Insurance (0.5% of CapEx): ₹16,95,625
– Property tax & admin: ₹10,00,000 

TOTAL ANNUAL OpEx: ₹60,87,000 

ANNUAL PROFIT: 

Revenue: ₹13,49,04,000 
Less OpEx: ₹60,87,000 
ANNUAL PROFIT (EBITDA): ₹12,88,17,000 

25-Year Financial Projection: 
YEAR 1-5 (Stable Operation): 
Annual Revenue: ₹13.49 crores 
Annual OpEx: ₹0.61 crores 
Annual Profit (EBITDA): ₹12.88 crores 
5-Year Total: ₹64.40 crores 

YEAR 6-10 (Panel Degradation -0.5%/year): 
Average Annual Revenue: ₹13.40 crores 
Annual OpEx: ₹0.65 crores 
Annual Profit: ₹12.75 crores 
5-Year Total: ₹63.75 crores 

YEAR 11-15: 
Average Annual Revenue: ₹13.22 crores 
5-Year Total: ₹62.50 crores 

YEAR 16-20: 
Average Annual Revenue: ₹13.04 crores 
5-Year Total: ₹61.25 crores 

YEAR 21-25: 
Average Annual Revenue: ₹12.87 crores 
5-Year Total: ₹60.00 crores

25-YEAR TOTAL REVENUE: ₹3,11,90,00,000 (₹311.9 crores)
25-YEAR TOTAL OpEx: ₹15,25,00,000 (₹15.25 crores)
25-YEAR NET PROFIT: ₹2,96,65,00,000 (₹296.65 crores!) 

AFTER-TAX RETURNS (Assuming 20% effective tax):
25-Year Net After Tax: ₹2,37,32,00,000 (₹237.32 crores)
Initial Investment: ₹33.91 crores
NET BENEFIT: ₹203.41 crores 
IRR (Internal Rate of Return): 34%+ (exceptional!) 
Payback Period: 2.6 years 

OPTION 1: 100% Equity Investment 
– Capital: ₹33.91 crores investor funds 
– Returns: 34% IRR (full investor capture) 
– Risk: Higher individual exposure 
– Suitable for: Large institutional investors 

OPTION 2: Debt-Equity (70:30) 
– Equity: ₹10.17 crores investor (30%) 
– Debt: ₹23.74 crores bank loan (70%), 7-year @ 8% 
– Debt Service: ₹4.68 crores/year initially 
– Equity Returns: 45-50% IRR (leveraged returns) 
– Suitable for: Return-maximizing investors 

OPTION 3: Project Finance 
– Senior Debt: ₹20 crores (60%) 
– Mezzanine: ₹6.78 crores (20%) 
– Equity: ₹7.13 crores (20%) 
– Blended Returns: 18-22% across structures 
– Suitable for: Professional project finance investors 

OPTION 4: EPC Turnkey (Developer Approach) 
– Developer takes project risk 
– Investor gets fixed returns or lease income 
– Returns: 12-15% IRR (lower but secure) 
– Suitable for: Conservative investors seeking stability

MW-Scale Project Development Lifecycle

End-to-End Project Implementation

Phase 1: Concept & Feasibility (Month 1-3)

Market & Policy Assessment 

  • Identify target market (state/region) 
  • Study renewable policy and incentives 
  • Assess grid capacity and demand
  • Evaluate auction opportunities

Site Selection & Land Acquisition 

  • Identify potential sites (solar potential 4.5+ kWh/m²/day)
  • Conduct land survey and acquisition 
  • Verify ownership and clearances 
  • Negotiate lease/purchase terms
  • Secure 250-1,000+ acres depending on capacity

Pre-Feasibility Study 

  • Conduct solar resource assessment 
  • Preliminary electrical design 
  • Environmental and social impact screening 
  • Market size and tariff analysis
  • Financial viability assessment

Phase 2: Detailed Engineering & Planning (Month 3-8)

Solar Resource Assessment 

  • Install solar radiation monitoring station 
  • 3-6 months data collection 
  • Precise generation forecasting 
  • Design optimal panel orientation 

Detailed Engineering Design 

  • String sizing and configuration 
  • Inverter placement and capacity 
  • Transformer and switchgear design 
  • Control systems and SCADA design
  • Grid interconnection design

Environmental & Regulatory Approvals 

  • Environmental Impact Assessment (EIA) 
  • Environmental Clearance (EC) from MoEFCC 
  • Forest clearance (if applicable) 
  • State-level approvals 
  • Grid connection approval from DISCOM/PGCIL
  • Village/Municipal permissions

Financial Planning & Structuring 

  • Detailed project report (DPR) preparation 
  • Financial model development 
  • Funding strategy and sources 
  • Debt-equity structure optimization
  • Insurance and risk management planning

Phase 3: Financial Closure (Month 8-12) 

Tender & Bid Submission 

  • Prepare competitive bid (if auction) 
  • Submit technical and financial proposal 
  • Secure Letter of Intent (LoI) 
  • Obtain Tariff/PPA approval 

Financing & Banking 

  • Secure debt funding (60-70% typical) 
  • Arrange equity investment (30-40%) 
  • Close financial arrangements
  • Obtain loan disbursement facility

Power Purchase Agreement (PPA) Signing 

  • Finalize PPA terms with buyer (utility/corporate)
  • Lock in tariff for 25 years (₹2.50-3.50/unit typical)
  • Define performance standards 
  • Establish contract penalties/incentives 

 

Phase 4: Procurement & Manufacturing (Month 12-18)

Equipment Procurement 

  • Issue purchase orders for panels, inverters 
  • Quality compliance verification 
  • Arrange logistics and warehousing 
  • Coordinate vendor certifications 

Manufacturing & Delivery 

  • Equipment manufactured per specifications 
  • Quality testing at manufacturer 
  • Inspection at site upon delivery 
  • Proper warehousing and protection 

Phase 5: Civil Construction (Month 12-20, parallel with procurement)

Site Development

  • Clear and level land 
  • Construct access roads 
  • Install underground cabling 
  • Build substation structure
  • Install fencing and security

Infrastructure Installation 

  • Install solar panel mounting structures 
  • Construct electrical rooms 
  • Install transformer and switchgear
  • Install control centers and SCADA room

Phase 6: Installation & Integration (Month 18-23)

System Installation 

  • Mount 62,500 kW+ solar panels (25 MW example)
  • Install 25+ inverters (1 MW each typically) 
  • Wire DC and AC systems 
  • Connect transformers and switchgear 
  • Install SCADA and monitoring systems 

Testing & Commissioning 

  • Individual string testing 
  • Inverter performance testing 
  • Transformer testing and oil analysis 
  • Full system load testing 
  • Grid synchronization testing 

Phase 7: Operations Commencement (Month 23-24)

Final Approvals & Inspection 

  • Technical inspection by grid operator 
  • Safety certification 
  • Environmental audit (if required)
  • Final government approval

Project Handover 

  • System operational acceptance 
  • Operations & Maintenance (O&M) contract initiation
  • Staff training on system monitoring 
  • Documentation and warranty transfer

EPC Services & Technology Partnerships

Full Engineering, Procurement & Construction Services

(Engineering, Procurement, Construction) Model: 

EPC APPROACH: 
Developer/Investor EPC Contractor (Raut RE) Turn-key solar plant 

EPC Contractor Responsibilities: 
– Engineering: Design optimization and engineering 
– Procurement: Source best-value equipment & materials
– Construction: Full implementation from foundation to operation
– Quality: Quality assurance and testing 
– Warranty: Performance guarantees

EPC Services Breakdown:
Engineering Services (15% of project cost typical)

Scope: 
– Detailed system design (electrical & civil) 
– SCADA & monitoring system design 
– Grid integration study
– Structural analysis for mounting 
– BIM (Building Information Modeling) 
– Performance simulations 
– Documentation & approvals support 

Deliverables: 
– Complete design drawings (electrical, civil, mechanical)
– Single line diagrams 
– Control logic and automation specs 
– Bill of materials with specifications 
– O&M manual and training materials 
Duration: 4-8 weeks 
Cost: ₹1-2 crores for 25 MW project

Procurement Services (50-55% of project cost) 
Equipment Sourcing: 
– Solar panels: Sourced from Tier-1 manufacturers 
– Inverters: ABB, Siemens, Schneider (or equivalent)
– Transformers: KPTCL, Siemens rated 
– Switchgear: High-voltage equipment certified 
– Cables & components: International standards 

Advantages: 
– Volume discounts (bulk purchasing) 
– Quality verification at source 
– Warranty consolidation 
– Spare parts management 
– Logistics coordination 

Procurement Timeline: 
– RFQ & Vendor Selection: 2 weeks 
– Purchase Order & Negotiation: 2 weeks 
– Manufacturing & QA: 8-12 weeks 
– Logistics & Warehousing: 2-4 weeks 
Total: 14-20 weeks 

Construction & Installation Services (25-30% of project cost) Civil Works:
– Site excavation and foundation 
– Mounting structure installation 
– Electrical infrastructure (trenches, conduits) 
– Substation construction 
– Building construction for control centers 
– Roads and drainage

Mechanical Installation: 
– Solar panel mounting (62,500+ kW in 25 MW project)
– Inverter installation (typically 25+ units of 1 MW each)
– Transformer and switchgear installation 
– Cabling and wiring (DC and AC systems) 
– SCADA hardware installation 

Electrical Works: 
– DC wiring (panels to inverters) 
– AC wiring (inverters to transformers) 
– High voltage connections (to grid) 
– Earthing and lightning protection 
– Control systems integration 

Installation Timeline: 8-12 weeks (weather dependent) Workforce: 500-1,000 personnel peak 
Quality Control: 100% inspection, third-party audits 
Safety: Zero-accident target, comprehensive safety protocols

Testing & Commissioning (5% of project cost) 

Factory Acceptance Testing (FAT): 
– Equipment performance at manufacturers 
– Pre-delivery inspection 
– Defect rectification 

Site Acceptance Testing (SAT): 
– Installed equipment verification 
– System integration testing 
– Safety testing (electrical safety) 
– Performance under various conditions 
– Grid synchronization testing

Commissioning Activities: 
– Operator training (30-50 personnel) 
– System documentation 
– Final performance certification 
– Handover documentation 
– Performance guarantees finalized 

Technology Partners & Equipment Quality: 
TIER-1 MANUFACTURERS (Our Preferred Partners):

Solar Panels: 
– Canadian Solar, Jinko Solar, JA Solar (efficiency: 21-23%)
– 25-year performance warranty (80-90% output guaranteed)
– Half-cell or bifacial technology options 

Inverters: 
– ABB, Siemens, Schneelect (reliability: 99%+) 
– MPPT algorithm for optimal power conversion 
– Redundancy & N+1 configuration options 

Transformers: 
– KPTCL, Siemens, Eaton (premium quality) 
– Temperature monitoring, oil analysis 
– Short-circuit impedance optimized 

SCADA & Monitoring: 
– Advanced monitoring systems 
– Real-time performance tracking 
– Predictive maintenance alerts 
– Mobile app & web dashboard 

Warranty & Performance: 
– Equipment warranties: 10-25 years 
– Performance warranties: 25-year generation guarantee
– Extended maintenance contracts available (15-25 years)

MW-Scale Site Requirements & Land Development

Land Requirements & Infrastructure Planning

Land Requirement Calculation: 
SOLAR FARM LAND REQUIREMENT: 

Per MW Generation Area Needed: 
– Panel area: 2,000-2,500 m² per MW 
– Spacing between rows: 40% additional 
– Infrastructure (roads, substations): 10% additional 
– Total usable area: 4,000-5,000 m² per MW (conservative estimate) Example: 25 MW Solar Park 
Panel Requirement: 25 MW 

Land required (@ 4,500 m²/MW): 25 × 4,500 = 1,12,500 m² 
= 11.25 hectares (minimum) 

Accounting for Practical Constraints: 
– Actual land needed: 250-300 acres (100-120 hectares) 
– Multiple buffer zones: 20% additional 
– Realistic requirement: 250-300 acres for 25 MW 

Land Cost Analysis: 
– Agricultural land: ₹10-20 lakhs/acre (varies by region) 
– 250 acres @ ₹15 lakhs/acre = ₹375 crores 
– OR lease model: ₹2-3 lakhs/acre/year 
– 250 acres @ ₹2.5 lakhs/acre/year = ₹62.5 crores/year 

Land Development Requirements: 
SITE INFRASTRUCTURE DEVELOPMENT:

Site Preparation (₹40-60 lakhs total): 
– Soil testing and treatment: ₹5-10 lakhs 
– Clearing and grading: ₹15-25 lakhs 
– Drainage system: ₹10-15 lakhs 
– Level ground achievement: ₹10-15 lakhs

Road Network (₹1.5-2.5 crores): 
– Main access road (2 lanes, 3-5 km): ₹75-125 lakhs 
– Internal distribution roads: ₹75-125 lakhs 
– Parking areas & maintenance access: ₹25-75 lakhs 

Infrastructure Development (₹1-1.5 crores): 
– Administration/office building: ₹30-50 lakhs 
– Operations center (SCADA room): ₹15-25 lakhs 
– Maintenance workshop: ₹10-20 lakhs 
– Security accommodation: ₹5-10 lakhs 
– Warehousing for spares: ₹10-20 lakhs 
– Canteen facilities: ₹5-10 lakhs 

Security & Fencing (₹50-80 lakhs): 
– Perimeter fencing: ₹30-50 lakhs 
– CCTV security system: ₹15-25 lakhs 
– Security office: ₹5-10 lakhs 

Environmental & Safety (₹30-50 lakhs): 
– Fire suppression system: ₹15-25 lakhs 
– Lightning protection: ₹10-15 lakhs 
– Environmental mitigation: ₹5-10 lakhs 
TOTAL LAND DEVELOPMENT: ₹3.5-5.5 crores (10-15% of total project cost) 

Environmental & Sustainability Considerations: 
SITE STEWARDSHIP PRACTICES: 

Land Use Optimization: 
– Dual-use agriculture possible (agri-voltaics) 
– Sheep grazing under panels (vegetation management) 
– Pollinator-friendly landscaping 
– Water retention systems 

Environmental Mitigation: 
– Tree plantation on perimeter (windbreak, aesthetics) 
– Rainwater harvesting system 
– Wastewater treatment (grey water reuse) 
– Zero waste construction and operations

Community Integration: 
– Local employment (construction + O&M) 
– Community training programs 
– Local procurement of supplies 
– CSR initiatives (school support, health camps) 

Regulatory Compliance: 
– Environmental Impact Assessment (EIA) 
– Environmental Clearance from MoEFCC 
– State environmental approval 
– Forest clearance (if applicable) 
– Water board clearance (if water-dependent)

MW-Scale Project Examples & Case Studies

Proven Large-Scale Solar Expertise

Case Study 1: 50 MW Solar Park – Gujarat 

Project Profile: 
– Capacity: 50 MW (one of India’s significant solar parks) 
– Location: Solar park designated zone, Kutch, Gujarat 
– Developer: Private developer + institutional investor 
– Investment: ₹65-70 crores 
– Timeline: 18 months development to operation 

Design Features: 
– 1,25,000 solar panels (400W each) 
– 50 x 1 MW string inverters (redundancy) 
– Advanced SCADA monitoring 
– Bi-facial panel technology (10% efficiency advantage) 

Financial Performance: 
– PPA Tariff: ₹2.55 per unit (highly competitive bid) 
– Annual Generation: 77,000,000 units 
– Annual Revenue: ₹19.64 crores 
– Annual OpEx: ₹0.85 crores 
– Annual Profit (EBITDA): ₹18.79 crores 
– IRR: 28%+ (institutional-grade returns)

Operational Results (Year 1-3): 
– Capacity factor: 22.5% (excellent) 
– System availability: 99.2% 
– O&M efficiency: Best-in-class </span
– Generation vs forecast: +2% outperformance 

Impact: 
– CO2 offset: 77,000 tons/year 
– Renewable capacity addition: Significant regional contribution
– Employment: 150+ during construction, 50+ permanent 
– Model for replication across Gujarat 

Case Study 2: 100 MW Corporate Renewable Agreement – Maharashtra

Project Profile: 
– Capacity: 100 MW (largest in Maharashtra state) 
– Location: Solar park, Aurangabad 
– Developer: Raut RE partners + large corporation buyer 
– Investment: ₹130-140 crores 
– Buyer: Large manufacturing corporation (long-term CRPA) 

Unique Features: 
– 25-year fixed tariff agreement 
– Hybrid solar + wind (partially) 
– Advanced battery storage integration (20 MW / 40 MWh) 
– 24/7 power availability with storage 

Financial Performance (Corporate Buyer): 
– Traditional tariff: ₹5 per unit 
– Solar + Storage tariff: ₹3 per unit (40% savings!) 
– Annual electricity cost reduction: ₹20+ crores 
– Corporate payback from savings: 6-7 years 
– ESG commitment achieved: 100 MW renewable

Raut RE Returns: 
– IRR: 15-17% (conservative premium for risk) 
– Stable cash flows (corporate buyer AAA-rated) 
– Long-term operational revenue 

Strategic Benefits: 
– Largest renewable deal in Maharashtra 
– Model for corporate-renewable partnerships 
– Corporate sustainability achievement 
– Regional energy security improvement

Take Control of Your Power Costs

Install rooftop solar and protect your home from unpredictable utility bills — start saving from day one.

Risk Management & Performance Guarantees

Mitigating Project Risks

Risk Probability Impact Mitigation
Generation Risk
Low
Medium
Performance guarantee, SCADA monitoring, panel warranty
Grid Connection
Medium
Medium
Early coordination, PGCIL approval, backup plans
Equipment Failure
Low
High
Equipment warranty 10-25 years, spare parts inventory
Weather/Force Majeure
Low
Medium Insurance, design for extreme weather, disaster fund
Tariff/PPA Risk
Very Low
High
Long-term PPA (25 years), AAA-rated buyer
Regulatory Change
Low
Low
Diversified project portfolio, advocacy
O&M Cost Inflation
Medium
Low
Fixed O&M contracts (5-10 year)
Land Acquisition
Low
High
Long-term leases, clear title documentation

GENERATION GUARANTEE 
– Minimum annual generation: ±15% of design estimate 
– If performance falls short: Compensation to investor 
– Typical guarantee: 85-90% of year 1 generation 
– Duration: 5 years (covers stabilization period) 
– Measurement: Independent third-party monitoring 

PANEL PERFORMANCE WARRANTY 
– Panel efficiency: Minimum 80% after 25 years 
– Defect warranty: 10-12 years comprehensive 
– Performance degradation: <0.5% per year maximum 
– Manufacturer backed: Tier-1 supplier guarantee

EQUIPMENT WARRANTY
– Inverters: 5-10 years comprehensive 
– Transformers: 10 years 
– BOP (Balance of Plant): 5 years 
– All-inclusive warranty available for extended periods 

OPERATIONAL PERFORMANCE 
– System availability: Minimum 99% 
– Response time for faults: <24 hours 
– Spare parts availability: Guaranteed stocking 
– Performance monitoring: 24/7 SCADA alerts

FINANCIAL GUARANTEE 
– IRR guarantee: Minimum guaranteed returns (contractual)
– Buyback option: Investor exit at predetermined terms
– Debt service reserve: Fund maintained for debt coverage
– Loan guarantee facility: Available from banks 

Why Choose Raut Renewable Energy – MW-Scale Projects

Trusted Large-Scale Solar Developer

35+ Years Experience

Established developer with track record

Proven Track Record

20+ successful MW-scale projects across India

Technology Excellence

Partnerships with Tier-1 global manufacturers

Financial Engineering

Expert in complex project financing

Government Relationships

Strong ties with NTPC, state utilities, regulators

Turnkey EPC Capability

End-to-end project delivery

Risk Management

Comprehensive guarantees and insurance

O&M Excellence

25-year operational support and monitoring

Frequently Asked Questions

What's the minimum project size you handle?
Typically 5+ MW (smaller projects have high per-MW costs). 1-5 MW feasible with customization. Contact us for feasibility.
Concept to operation: 18-24 months typical. Timeline varies by location, approvals, financing complexity.
12-20% IRR typical depending on tariff, financing, and risk structure. Competitive bidding usually brings 12-15% IRR.
Yes. 25-year PPAs standard for utility/corporate buyers. Tariff: ₹2.50-3.50/unit typical (varies by location, tariff trend).
70:30 (debt:equity) most common. Ranges from 60:40 (conservative) to 75:25 (leveraged). Depends on lender requirements.
Performance guarantees, equipment warranties, insurance, diversified financing, long-term PPAs. Comprehensive risk mitigation package.
Yes. Lease model common (₹2-3 lakhs/acre/year). Reduces upfront capital, improves returns. 25-year leases standard.
System continues generating. Post-25-year revenue typically lower (no PPA), but still profitable. Some projects get extension PPAs.
Yes. Hybrid projects increasingly popular. Smoothens generation, attracts premium tariffs (₹3-4/unit possible). More complex engineering.
Contact us for detailed consultation. We assess project potential, feasibility, financing options, timeline, and competitive positioning.

Develop Large-Scale Solar – Institutional Returns

MW-Scale Solar Installation Services

1-100+ MW Projects

Turnkey EPC Services

12-20% IRR Returns

25-Year PPA Contracts

Government-Backed Buyerships

Detailed Project Feasibility Reports

Financial Modeling & Bankability Assessment

Complete Project Development Support

Switch to clean energy and save up to 40% on bills.

Schedule a Consultation